A while ago I promised to update you all on the progress on our remodeling project so here goes. We finally, after some dissapointments managed to pass electrical rough in inspection and then we were able to get framing inspection which was no problem at all compared to electrical(no suprise considering that I've done that part of the work for a long time). Now we are free to insulate the walls properly and put up the poly which we'll have to have inspected before we can sheetrock. Which means that we can't insulate the attic properly yet as I'll have to put sheetrock on the ceiling before blowing in insulation. I've slowed down considerably(no longer working on it for 5 hours before going to work for another 8 or 10), just going at a much more sustainable pace. We plan on going to the parade of homes this Saturday to see if we can find any more ideas that would be nice to incorporate while we're still able to easily do it. I'm hoping I can convince Missi that a small sink in the island would be nice. We'll see how it goes. Missi is thrilled that we were able to move our bedroom into the master bedroom as it is much bigger than the study where we have been since we slept in the living room. She said it's nice to have "an adult bedroom". More to follow when we have something new.
Ivan
3 comments:
Thanks for the update. A sink in the island sounds awesome! Its fun to get ideas and try to implement them. Wishing you the best in the continuation of the remodeling!!!
Heather
would love to see pictures of your project! I would love to have a big island with a sink.
Jenny
Would have loved to stop as we were
coming through on Monday evening but I wasn't feeling well. Would have wanted to add pictures to our
file of your remodeling. dk
Post a Comment